Project Walker Improving Operations Safety and Connectivity on SC 81 at I-85

The SC 81 corridor at I-85 is continuing to experience rapid industrial and residential growth. The County and SCDOT recognize that this has led to safety and capacity issues near the I-85 interchange. To address these issues, the County is proposing a multi-solution approach to improve connectivity and make it safer for drivers to move through the corridor.

Project Highlights

SC 81/I-85 Interchange Improvements

  • Widening and lengthening the I-85 southbound exit ramp to SC 81 at Exit 27 to accommodate a dedicated right turn lane and two left turn lanes.

Constructing Orange Way Extension

  • Constructing the new location Orange Way Extension from Martin Road to SC 81.
  • Installing a new traffic signal at the intersection of the proposed Orange Way Extension, Webb Road and SC 81.
  • Adding eastbound left and right turn lanes to existing Orange Way at Martin Road.

Ryobi Drive Safety Improvements

  • Removing the left turn lane from Ryobi Drive eastbound at SC 81 and converting to right-out only.

Project Location Map

Map showing improvement locations along Webb Road west of route 81 ro Martin Road, Ryobi Drive just west of route 81, and the offramp at exit 27 on I-85

I-85 southbound exit ramp improvements and Orange Way Extension

Minimal Right-of-Way Impacts

Most of the proposed project work is anticipated to occur within the existing right-of-way along I-85, SC 81, Martin Road, Ryobi Drive, Webb Road, and Orange Way. An approximate 150-200-foot  proposed right-of-way would contain the extension of Orange Way located between Martin Road and SC 81.

Questions / Comments?

Do you have questions or comments on the proposed project? Contact Anderson County Project Manager, Jonathan Fox at jwfox@andersoncountysc.org